💡 Key Learnings

💡

OEE Reveals Where to Focus

OEE decomposes your losses into actionable categories: Low Availability? → Fix maintenance, changeovers, supply chain Low Performance? → Fix equipment speed, minor stops Low Quality? → Fix yield,...

Feb 22, 2026 Factories & Production
💡

Find and Fix Bottlenecks — Everything Else is Waste

Only the bottleneck limits your system. Investing in anything OTHER than the bottleneck = wasted money. Example: If ingredient station is your bottleneck at 80/hour, buying a faster bread slicer...

Feb 22, 2026 Factories & Production
💡

Learning Curves Are Your Trajectory

Rate of improvement matters more than current position. A company at 1M units can catch a competitor at 10M units IF they have: • Steeper learning curve • More capital to accumulate production...

Feb 22, 2026 Factories & Production
💡

Yield is Your Highest Leverage

Small yield improvements = huge profit impact. The economic impact goes beyond direct scrap costs: • Less inspection needed • Lower warranty costs • Better reputation • More capacity from same...

Feb 22, 2026 Factories & Production
💡

Understand Your Cost Structure

High fixed costs = great at scale, but high risk at low utilization. A factory running at 50% utilization doesn't have 50% profit — it likely has NEGATIVE profit because fixed costs spread over...

Feb 22, 2026 Factories & Production
💡

Capacity = Bottleneck (Fix only the constraint)

"Improving anything OTHER than the bottleneck doesn't improve the system." Capital deployment should follow the bottleneck. As you solve one constraint, the bottleneck shifts. Types: Nameplate...

Feb 22, 2026 Factories & Production
💡

OEE = Availability × Performance × Quality

Overall Equipment Effectiveness measures actual vs theoretical capacity. World-class OEE = 85%+, Most factories = 60% or below. Where to focus: • Low Availability → Fix maintenance,...

Feb 22, 2026 Factories & Production
💡

Wright's Law: Every 2x production = 20% cost reduction

Learning curves show that for every doubling of cumulative production, costs drop ~20%. Drivers: Labor efficiency, process optimization, yield improvement, design for manufacturing, supplier...

Feb 22, 2026 Factories & Production
💡

Yield Economics: 20-point advantage = $25/unit savings

70% yield means 43% cost premium vs 100% yield. Example: Factory A (70% yield) costs $114.29/good unit. Factory B (90% yield) costs $88.89/good unit. That 20-point yield advantage = $25.40...

Feb 22, 2026 Factories & Production